Concrete Calculator

Calculate how much concrete you need for your project.

Advertisement

Estimate concrete volume for slabs, footings, columns and cylinders, then compare bag and material scenarios.

Metric: long dimensions m, short dimensions cm. Imperial: long dimensions ft, short dimensions in. No thousands separators.

Select Shape

Unit System

Editable assumptions

Defaults are editable, unverified legacy examples: density 2400 kg/m³; yields 0.016/0.0153/0.022 m³ per 40 kg/60 lb/80 lb bag; cement/sand/gravel/water 350/700/1050 kg/175 L per m³.

Slab/footing: length × width × thickness. Column: width × depth × height. Cylinder: π × (diameter/2)² × height. Multiply by quantity, then by 1 + waste/100.

Input limits: dimensions 0.000001–100000 in their shown units; density 1–10000 kg/m³; bag yield 0.000001–100 m³; material rates 0–10000 kg/m³ or L/m³. Up to 32 characters per numerical input; exponent notation is allowed.

Rectangular calculations and unit conversions use exact decimals. Cylinder uses π≈3.141592653589793. Display: up to 6 decimals for volume, 2 for materials/weight; bags round upward from unrounded volume.

Base volume before waste: m³. All other results include the entered waste allowance.

Volume
m³
Volume
yd³
Weight
kg
Weight
lbs

Bags Needed

40 kg bags
60 lb bags
80 lb bags

Materials Breakdown — Illustrative material scenario

Cement (kg)
Sand (kg)
Gravel (kg)

+ ~ Water (liters)

This is a quantity scenario, not a concrete mix specification or structural design. Check actual product yield and project specifications. Positive dimensions ≤100000; integer quantity 1–100000; waste 0–50%; total ≤10⁹ m³. No dedicated export or saved draft.

Copied

Copy failed. Select the result and copy it manually.

Embed this tool on your website

Use whole pixel dimensions from 1 to 4096.

× px (1–4096)

                        

💡 Integration Tip

Copy the embed code and paste it into your website HTML. The responsive version adapts to all screen sizes automatically.

2.5
4 ratings
✓

Method and limits

Slab/footing: length × width × thickness. Column: width × depth × height. Cylinder: π × (diameter/2)² × height. Multiply by quantity, then by 1 + waste/100.

Defaults are editable, unverified legacy examples: density 2400 kg/m³; yields 0.016/0.0153/0.022 m³ per 40 kg/60 lb/80 lb bag; cement/sand/gravel/water 350/700/1050 kg/175 L per m³.

Rectangular calculations and unit conversions use exact decimals. Cylinder uses π≈3.141592653589793. Display: up to 6 decimals for volume, 2 for materials/weight; bags round upward from unrounded volume.

This is a quantity scenario, not a concrete mix specification or structural design. Check actual product yield and project specifications. Positive dimensions ≤100000; integer quantity 1–100000; waste 0–50%; total ≤10⁹ m³. No dedicated export or saved draft.

Input limits: dimensions 0.000001–100000 in their shown units; density 1–10000 kg/m³; bag yield 0.000001–100 m³; material rates 0–10000 kg/m³ or L/m³. Up to 32 characters per numerical input; exponent notation is allowed.

Calculations run in this page; this tool does not save your measurements. Shared page actions are separate.

About Concrete Calculator

Estimate concrete volume for slabs, footings, columns and cylinders, then compare bag and material scenarios.

2 m × 3 m × 10 cm, quantity 1, waste 0% gives 0.6 m³; 10% gives 0.66 m³.

100 cm × 100 cm × 1 m column gives 1 m³ before waste.

This is a quantity scenario, not a concrete mix specification or structural design. Check actual product yield and project specifications. Positive dimensions ≤100000; integer quantity 1–100000; waste 0–50%; total ≤10⁹ m³. No dedicated export or saved draft.

Use Cases

Estimate volume for a slab, footing, column or cylinder from its dimensions and quantity.
Compare waste allowances, bag yields and illustrative material quantities for the same volume.

How to use

1

Choose the shape and units; enter only the dimensions shown, quantity and waste percentage.

2

Open the assumptions to enter product yields, density and material quantities, then calculate.

Pro Tips

  • Metric: long dimensions m, short dimensions cm. Imperial: long dimensions ft, short dimensions in. No thousands separators.
  • Defaults are editable, unverified legacy examples: density 2400 kg/m³; yields 0.016/0.0153/0.022 m³ per 40 kg/60 lb/80 lb bag; cement/sand/gravel/water 350/700/1050 kg/175 L per m³.

Frequently Asked Questions

Each bag size has an editable yield. Counts are alternative purchase scenarios, not amounts to add together; use the manufacturer's stated yield.

No. The numbers remain your draft; the unit labels change. Re-enter measurements in the selected units and calculate again.